Join Staytite on 18 and 19 June at Porterbrook's Long Marston Rail Innovation Centre - Staytite stand B2, as part of the S&C Alliance marquee. On the stand the company will be demonstrating the Hardlock Nut, an all-metal fastener designed to resist loosening in even the most extreme environments.
Currently used throughout Network Rail infrastructure including fishplates, OLE masts, axle counters, stretcher bars, and temporary rail clamps to name but a few. Do you have an application that is prone to loosening? Stop by for a demo!
For applications where monitoring of bolt clamp load is essential, Staytite will be demonstrating Intelligent Bolts that allow remote monitoring, reducing the need for on-site inspections. Joints can be inspected through the InterBolt cloud service, providing the live status of the joint as well as a complete history of telemetry data.
Staytite House, Coronation Road
Cressex Business Park
HP12 3RP
UNITED KINGDOM
0300 373 9029